This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
cluster:130 [2014/07/02 19:07] hmeij [Costs] |
cluster:130 [2014/07/15 13:43] hmeij [Report] |
||
---|---|---|---|
Line 2: | Line 2: | ||
\\ | \\ | ||
**[[cluster: | **[[cluster: | ||
+ | |||
+ | |||
+ | ==== Report ==== | ||
+ | |||
+ | |||
+ | {{: | ||
+ | |||
+ | |||
==== Total Jobs Submitted ==== | ==== Total Jobs Submitted ==== | ||
Line 8: | Line 16: | ||
{{: | {{: | ||
+ | |||
+ | A picture of our total number of job slots availability and cumulative total of jobs processed. | ||
< | < | ||
- | 06/ | + | " |
- | 06/ | + | 06/ |
- | 05/ | + | 06/ |
- | 03/ | + | 05/ |
- | 11/ | + | 03/ |
- | 07/ | + | 11/ |
- | 06/ | + | 07/ |
+ | 06/ | ||
</ | </ | ||
==== 2014 Queue Usage ==== | ==== 2014 Queue Usage ==== | ||
Line 27: | Line 38: | ||
^ HPC Cluster | ^ HPC Cluster | ||
| | | | | | ||
- | | {{: | + | | {{: |
| | | | | | ||
Line 34: | Line 45: | ||
^ HPC Cluster | ^ HPC Cluster | ||
| | | | | | ||
- | | {{: | + | | {{: |
| | | | | | ||
Line 41: | Line 52: | ||
^ HPC Cluster | ^ HPC Cluster | ||
| | | | | | ||
- | | {{: | + | | {{: |
| | | | ||
Line 122: | Line 133: | ||
These options would require sufficiently sized hardware that than logically can be presented as virtual nodes (with virtual CPU, virtual disk and virtual network on board). | These options would require sufficiently sized hardware that than logically can be presented as virtual nodes (with virtual CPU, virtual disk and virtual network on board). | ||
+ | < | ||
+ | [root@sharptail ~]# for i in `seq 33 45`; do bhosts -w n$i| grep -v HOST; done | ||
+ | HOST_NAME | ||
+ | n33 ok | ||
+ | n34 ok | ||
+ | n35 ok | ||
+ | n36 ok | ||
+ | n37 ok | ||
+ | n38 closed_Adm | ||
+ | n39 closed_Adm | ||
+ | n40 ok | ||
+ | n41 ok | ||
+ | n42 ok | ||
+ | n43 ok | ||
+ | n44 ok | ||
+ | n45 ok | ||
+ | |||
+ | [root@sharptail ~]# for i in `seq 33 45`; do lsload n$i| grep -v HOST; done | ||
+ | HOST_NAME | ||
+ | n33 | ||
+ | n34 | ||
+ | n35 | ||
+ | n36 | ||
+ | n37 -ok 20.9 20.7 20.6 56% | ||
+ | n38 -ok 16.0 10.9 | ||
+ | n39 -ok 20.4 21.1 22.1 63% | ||
+ | n40 | ||
+ | n41 | ||
+ | n42 | ||
+ | n43 | ||
+ | n44 | ||
+ | n45 | ||
+ | </ | ||
==== Costs ==== | ==== Costs ==== | ||
Here is a rough listing of what costs the HPCC generates and who pays the bill. Acquisition costs have so far been covered by faculty grants and the Dell hardware/ | Here is a rough listing of what costs the HPCC generates and who pays the bill. Acquisition costs have so far been covered by faculty grants and the Dell hardware/ | ||
+ | |||
+ | * Grants | ||
+ | * First $270K | ||
+ | * Second $270K (first purchase $155K, second purchase $120K) | ||
+ | * Dell replacement $62K | ||
* Recurring | * Recurring | ||
Line 131: | Line 180: | ||
* Energy consumed in data center for power and cooling, annual. | * Energy consumed in data center for power and cooling, annual. | ||
* At peak performance 30.5 KwH for power is estimated, that translates to $32K/year. | * At peak performance 30.5 KwH for power is estimated, that translates to $32K/year. | ||
- | * Add 50% for cooling energy needs (we're assuming efficient hardware) | + | * Add 50% for cooling energy needs (we're assuming efficient, green hardware) |
* Total energy costs: at 75% performance $36K/year, Physical Plant. | * Total energy costs: at 75% performance $36K/year, Physical Plant. | ||
* Software (Matlab, Mathematica, | * Software (Matlab, Mathematica, | ||
Line 141: | Line 190: | ||
* Each time we buy new racks), $2,500, ITS/ACS. | * Each time we buy new racks), $2,500, ITS/ACS. | ||
* One year of extended HP hardware support. | * One year of extended HP hardware support. | ||
- | * To cover period /home moving from greentail to sharptail, $2200, ITS/TSS. | + | * To cover period /home moving from greentail to sharptail, $2,200, ITS/TSS. |
+ | * Contributed funds to GPU HPC acquisition | ||
+ | * DLB Josh Boger, $5-6K | ||
+ | * QAC $2-3K | ||
+ | * Physics $1-2K | ||
\\ | \\ | ||
**[[cluster: | **[[cluster: |