The HPCC is in the top row of racks on the left (room for 3 additional racks, light yellow dots, 5 existing racks, dark yellow dots). | The HPCC is in the top row of racks on the left (room for 3 additional racks, light yellow dots, 5 existing racks, dark yellow dots). | ||
+ | |||
+ | ===== Tech Summary ===== | ||
+ | |||
+ | You don't get approval for a roughly $250K project without some serious reasons and numbers. To start with an air flow dynamics analysis, and attempted improvements, | ||
+ | |||
+ | There are two sources of power and most racks (other than HPCC) are tied into both. Emergency power that comes from the enterprise UPS (with bypass to utility power and backed by gas generator) and plain utility power delivered directly from the power grid. The UPS logs kwh consumed. The utility panels were clamped for a month and consumption logged. The HPCC racks were individually logged using an PDU with amp meter. Since the HPCC is a big variable much effort was spend to assess it's consumption, | ||
+ | |||
+ | ^ Excley Data Center Loads ^ total kW ^ | ||
+ | | Emergency power backed racks (x2)| 43.5| | ||
+ | | HPC Racks| | ||
+ | | Storage (rstore)| | ||
+ | | GPU expansion| | ||
+ | ^ Sub Total^ | ||
+ | | Expansion Capacity - up to 25% of current load| 18| | ||
+ | ^ Sub Total^ | ||
+ | | Lighting load and building envelope losses| | ||
+ | ^ Total Data Center Cooling Load^ 94.5 kW^ | ||
+ | | Miscellaneous Load - UPS Lossess| | ||
+ | |||
+ | The total cooling load for the data center space including load values above, and a potential for a 25% capacity increase is approximately – 94.5 kW. The 5 kW load associated with heat loss from the UPS is not factored into the data center cooing load and is planned to be handled separately. | ||
+ | |||
+ | It is recommended for the purpose of the study to use a total load of approximately 88kw, based | ||
+ | on the capacity of the proposed cooling units. That would account for enough capacity to handle | ||
+ | today' | ||
+ | cooling installed would also have the ability to be expandable if additional growth is required | ||
+ | beyond the 88 kW design limit. The breakdown of the proposed load is as follows: | ||
+ | |||
+ | ^ Proposed Excley Data Center Loads ^ total kW ^ | ||
+ | | Emergency power backed racks (x2)| 43.5| | ||
+ | | HPC Racks| | ||
+ | | Storage (rstore)| | ||
+ | | GPU expansion| | ||
+ | ^ Sub Total^ | ||
+ | | Expansion Capacity - up to 18% of current load| 13| | ||
+ | ^ Sub Total^ | ||
+ | | Lighting load and building envelope losses| | ||
+ | ^ Total Data Center Cooling Load^ 89.5 kW^ | ||
+ | | Miscellaneous Load - UPS Lossess| | ||
+ | |||
+ | |||
===== June Meetings ===== | ===== June Meetings ===== | ||
Line 110: | Line 150: | ||
{{: | {{: | ||
- | {{: | + | {{: |
{{: | {{: | ||
{{: | {{: | ||
Line 143: | Line 183: | ||
Open more floor near old CRAC1 to get more cold air from old CRAC3\\ | Open more floor near old CRAC1 to get more cold air from old CRAC3\\ | ||
Room/Racks temp monitor log started anticipating room air flow changes\\ | Room/Racks temp monitor log started anticipating room air flow changes\\ | ||
+ | |||
+ | **8/13** | ||
+ | |||
+ | Cancelled | ||
+ | |||
+ | **8/20** | ||
+ | |||
+ | Meetings moved to Thu afternoon (1pm now vs 7:30am)\\ | ||
+ | New CRAC2 unit on, data center temp dropped 5-7 degrees\\ | ||
+ | Modular wall up\\ | ||
+ | Fire suppressant install next, followed by ceiling\\ | ||
+ | Old CRAC1 demolishing started\\ | ||
+ | |||
+ | **08/22** | ||
+ | |||
+ | Wall AC units on\\ | ||
+ | Dim switch relocated, network area missing led installed\\ | ||
+ | Old CRAC1 removed\\ | ||
+ | Floor tiles slowly reconfigure, | ||
+ | Condenser leak in second unit, new item shipped\\ | ||
+ | Deliver new CRACR1 before move in day\\ | ||
+ | Fire suppression wiring and piping today\\ | ||
+ | |||
+ | |||
===== Aug Photos ===== | ===== Aug Photos ===== | ||
Line 148: | Line 212: | ||
{{: | {{: | ||
{{: | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
+ | {{: | ||
- | |||
- | \\ | ||
**[[cluster: | **[[cluster: |