cluster:178 [2019/08/16 13:01]
hmeij07 [Tech Summary]
cluster:178 [2019/08/20 11:46]
hmeij07 [Aug Meetings]
Line 44: Line 44:
  
 ^  Proposed Excley Data Center Loads  ^  total kW  ^ ^  Proposed Excley Data Center Loads  ^  total kW  ^
-|  Emergency power backed racks|  43.5|+|  Emergency power backed racks (x2)|  43.5|
 |  HPC Racks|  22 (Peak)| |  HPC Racks|  22 (Peak)|
 |  Storage (rstore)|  2| |  Storage (rstore)|  2|
Line 187: Line 187:
  
 Cancelled Cancelled
 +
 +**8/20**
 +
 +Meetings moved to Thu afternoon (1pm now vs 7:30am)
 +New CRAC2 unit on, data center temp dropped 5-7 degrees
 +Modular wall up
 +Fire suppressant install next, followed by ceiling
 +Reconfigure floor tiles near CRAC2
 +Old CRAC1 demolishing started
 +
  
 ===== Aug Photos ===== ===== Aug Photos =====