 ^  Proposed Excley Data Center Loads  ^  total kW  ^ ^  Proposed Excley Data Center Loads  ^  total kW  ^
-|  Emergency power backed racks|  43.5|+|  Emergency power backed racks (x2)|  43.5|
 |  HPC Racks|  22 (Peak)| |  HPC Racks|  22 (Peak)|
 |  Storage (rstore)|  2| |  Storage (rstore)|  2|
Line 187: Line 187:
  
 Cancelled Cancelled
 +
 +**8/20**
 +
 +Meetings moved to Thu afternoon (1pm now vs 7:30am)
 +New CRAC2 unit on, data center temp dropped 5-7 degrees
 +Modular wall up
 +Fire suppressant install next, followed by ceiling
 +Reconfigure floor tiles near CRAC2
 +Old CRAC1 demolishing started
 +
  
 ===== Aug Photos ===== ===== Aug Photos =====
Line 203: Line 213:
 {{:cluster:100_2354_small.jpg?nolink&300|}} Charging, R-410A gas only, zeotropic mixture\\ {{:cluster:100_2354_small.jpg?nolink&300|}} Charging, R-410A gas only, zeotropic mixture\\
 {{:cluster:100_2378_small.jpg?nolink&300|}} Seriously. Pink! Official industrial color\\ {{:cluster:100_2378_small.jpg?nolink&300|}} Seriously. Pink! Official industrial color\\
-{{:cluster:100_2369_small.jpg?nolink&300|}} New Hall/Atwater-Excley generator, 450 Kw, 16,000 lbs\\+{{:cluster:100_2369_small.jpg?nolink&300|}} New Hall/Atwater-Excley generator (green one ;), 450 Kw, 16,000 lbs\\
  
  
 \\ \\