^ Proposed Excley Data Center Loads ^ total kW ^ | ^ Proposed Excley Data Center Loads ^ total kW ^ | ||
- | | Emergency power backed racks| | + | | Emergency power backed racks (x2)| 43.5| |
| HPC Racks| | | HPC Racks| | ||
| Storage (rstore)| | | Storage (rstore)| | ||
Line 187: | Line 187: | ||
Cancelled | Cancelled | ||
+ | |||
+ | **8/20** | ||
+ | |||
+ | Meetings moved to Thu afternoon (1pm now vs 7:30am)\\ | ||
+ | New CRAC2 unit on, data center temp dropped 5-7 degrees\\ | ||
+ | Modular wall up\\ | ||
+ | Fire suppressant install next, followed by ceiling\\ | ||
+ | Old CRAC1 demolishing started\\ | ||
+ | |||
+ | **08/22** | ||
+ | |||
+ | Wall AC units on\\ | ||
+ | Dim switch relocated, network area missing led installed\\ | ||
+ | Old CRAC1 removed\\ | ||
+ | Floor tiles slowly reconfigure, | ||
+ | Condenser leak in second unit, new item shipped\\ | ||
+ | Deliver new CRACR1 before move in day\\ | ||
+ | Fire suppression wiring and piping today\\ | ||
+ | |||