cluster:178 [2019/08/20 12:40]
hmeij07 [Aug Photos]
cluster:178 [2019/08/22 17:46]
hmeij07 [Aug Meetings]
Line 190: Line 190:
 **8/20** **8/20**
  
-Meetings moved to Thu afternoon (1pm now vs 7:30am) +Meetings moved to Thu afternoon (1pm now vs 7:30am)\\ 
-New CRAC2 unit on, data center temp dropped 5-7 degrees +New CRAC2 unit on, data center temp dropped 5-7 degrees\\ 
-Modular wall up +Modular wall up\\ 
-Fire suppressant install next, followed by ceiling +Fire suppressant install next, followed by ceiling\\ 
-Reconfigure floor tiles near CRAC2 +Old CRAC1 demolishing started\\ 
-Old CRAC1 demolishing started+ 
 +**08/22** 
 + 
 +Wall AC units on\\ 
 +Dim switch relocated, network area missing led installed\\ 
 +Old CRAC1 removed\\ 
 +Floor tiles slowly reconfigure, monitor temps\\ 
 +Condenser leak in second unit, new item shipped\\ 
 +Deliver new CRACR1 before move in day\\ 
 +Fire suppression wiring and piping today\\
  
  