This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
cluster:178 [2019/08/26 15:28] hmeij07 [Tech Summary] |
cluster:178 [2019/08/26 15:29] hmeij07 [New design] |
||
---|---|---|---|
Line 6: | Line 6: | ||
**Exley Science Center – 265 Church St. – Data Center HVAC Replacement** | **Exley Science Center – 265 Church St. – Data Center HVAC Replacement** | ||
- | Replace computer room air conditioning units, replace rooftop condensing units, install new economizer and pump package, install new drop ceiling and lighting, install hot and cold isle containment system. | + | Replace computer room air conditioning units, replace rooftop condensing units, install new economizer and pump package, install new drop ceiling and lighting, install hot and cold isle containment system. |
* Project Schedule: 5/28/19 – 10/1/2019 | * Project Schedule: 5/28/19 – 10/1/2019 |