**Exley Science Center – 265 Church St. – Data Center HVAC Replacement** | **Exley Science Center – 265 Church St. – Data Center HVAC Replacement** |
| |
Replace computer room air conditioning units, replace rooftop condensing units, install new economizer and pump package, install new drop ceiling and lighting, install hot and cold isle containment system. New system will replace a ~40-year-old system that is critical for the campus IT infrastructure and save 260,000 kWh/yr of electricity (estimated at $35,000 in annual savings). | Replace computer room air conditioning units, replace rooftop condensing units, install new economizer and pump package, install new drop ceiling and lighting, install hot and cold isle containment system. New system will replace a ~40-year-old system that is critical for the campus IT infrastructure. |
| |
* Project Schedule: 5/28/19 – 10/1/2019 | * Project Schedule: 5/28/19 – 10/1/2019 |
⦁ ROI of 7-8 years\\ | ⦁ ROI of 7-8 years\\ |
| |
| [[https://www.vertiv.com/en-us/support/tools-applications/free-cooling-economizer-calculator/|Vertiv Free Cooling Calculator]] 80 degree return air (conservative) with 70% load rates full free cooling hours are at 44% for Bridgeport and 48% for Hartford. So the expected 40% lsted aboveis low water mark as that percentage goes up if return air gets hotter. At 85 degree it yields between 53-56%. |
===== Tech Summary ===== | ===== Tech Summary ===== |
| |
{{:cluster:pp-crac1-small.jpg?nolink&300|}} Old CRAC1 removed, new frame installed\\ | {{:cluster:pp-crac1-small.jpg?nolink&300|}} Old CRAC1 removed, new frame installed\\ |
| |
| ===== Sept Meetings ===== |
| |
| **09/05** |
| |
| New electrician but critical work coming up\\ |
| Missing one track sensor\\ |
| CARC1 installed, piping finish and leak test\\ |
| New CRAC1 power up 9/19 by Liebert with owner training\\ |
| Duct work and dampers install today\\ |
| |
| **09/19** |
| |
| Cancelled |
| |
| ===== Sept Photos ===== |
| |
| {{:cluster:100_2396_small.jpg?nolink&300|}} 5-6 feet cold aisle \\ |
| {{:cluster:100_2402_small.jpg?nolink&300|}} Tour Guide \\ |
| {{:cluster:100_2407_small.jpg?nolink&300|}} New CRAC1 pressurizing\\ |
| {{:cluster:100_2409_small.jpg?nolink&300|}} L-room return damper to hot aisle \\ |
| {{:cluster:100_2410_small.jpg?nolink&300|}} 1of2 L-Room cold air supply damper \\ |
| {{:cluster:100_2414_small.jpg?nolink&300|}} |
| {{:cluster:100_2416_small.jpg?nolink&300|}} Aiy. Drilling asbestos hot tiles \\ |
| {{:cluster:100_2420_small.jpg?nolink&300|}} 10/19 Startup delayed \\ |
| {{:cluster:100_2424_small.jpg?nolink&300|}} Cold aisle floor tile replacements\\ |
| {{:cluster:100_2430_small.jpg?nolink&300|}} Old CRAC3 removed, 9/13/2019 \\ |
| {{:cluster:100_2433_small.jpg?nolink&300|}} Circulation pumps inside Economizer \\ |
| {{:cluster:100_2449_small.jpg?nolink&300|}} New wall paint job. Thanks! \\ |
| {{:cluster:100_2451_small.jpg?nolink&300|}} Zeocryte cylinder herd \\ |
| {{:cluster:100_2456_small.jpg?nolink&300|}} |
| {{:cluster:100_2454_small.jpg?nolink&300|}} Old and new fans \\ |
| {{:cluster:100_2465_small.jpg?nolink&300|}} Vinyl doors and curtains \\ |
| {{:cluster:100_2467_small.jpg?nolink&300|}} Top of racks vinyl curtain \\ |
| {{:cluster:100_2468_small.jpg?nolink&300|}} Ayi. More drilling into hot floor tiles \\ |
| |
**[[cluster:0|Back]]** | **[[cluster:0|Back]]** |