Line 245: Line 245:
 {{:cluster:pp-crac1-small.jpg?nolink&300|}} Old CRAC1 removed, new frame installed\\ {{:cluster:pp-crac1-small.jpg?nolink&300|}} Old CRAC1 removed, new frame installed\\
  
 +===== Sept Meetings =====
 +
 +**09/05**
 +
 +New electrician but critical work coming up\\
 +Missing one track sensor\\
 +CARC1 installed, piping finish and leak test\\
 +New CRAC1 power up 9/19 by Liebert with owner training\\
 +Duct work and dampers install today\\
 +
 +**09/19**
 +
 +Cancelled
 +
 +===== Sept Photos =====
 +
 +{{:cluster:100_2396_small.jpg?nolink&300|}} 5-6 feet cold aisle \\
 +{{:cluster:100_2402_small.jpg?nolink&300|}} Tour Guide \\
 +{{:cluster:100_2407_small.jpg?nolink&300|}} New CRAC1 pressurizing\\
 +{{:cluster:100_2409_small.jpg?nolink&300|}} L-room return damper to hot aisle \\
 +{{:cluster:100_2410_small.jpg?nolink&300|}} 1of2 L-Room cold air supply damper \\
 +{{:cluster:100_2414_small.jpg?nolink&300|}} 
 +{{:cluster:100_2416_small.jpg?nolink&300|}} Aiy. Drilling asbestos hot tiles \\
 +{{:cluster:100_2420_small.jpg?nolink&300|}} 10/19 Startup delayed \\
 +{{:cluster:100_2424_small.jpg?nolink&300|}} Cold aisle floor tile replacements\\
  