{{:cluster:pp-crac1-small.jpg?nolink&300|}} Old CRAC1 removed, new frame installed\\ | {{:cluster:pp-crac1-small.jpg?nolink&300|}} Old CRAC1 removed, new frame installed\\ |
| |
| ===== Sept Meetings ===== |
| |
| **09/05** |
| |
| New electrician but critical work coming up\\ |
| Missing one track sensor\\ |
| CARC1 installed, piping finish and leak test\\ |
| New CRAC1 power up 9/19 by Liebert with owner training\\ |
| Duct work and dampers install today\\ |
| |
| **09/19** |
| |
| Cancelled |
| |
| ===== Sept Photos ===== |
| |
| {{:cluster:100_2396_small.jpg?nolink&300|}} 5-6 feet cold aisle \\ |
| {{:cluster:100_2402_small.jpg?nolink&300|}} Tour Guide on back of modular wall \\ |
| {{:cluster:100_2407_small.jpg?nolink&300|}} New CRAC1 pressurizing\\ |
| {{:cluster:100_2409_small.jpg?nolink&300|}} L-room return damper to hot aisle \\ |
| {{:cluster:100_2410_small.jpg?nolink&300|}} 1of2 L-Room cold air supply damper \\ |
| {{:cluster:100_2414_small.jpg?nolink&300|}} |
| {{:cluster:100_2416_small.jpg?nolink&300|}} Aiy. Drilling asbestos hot tiles \\ |
| {{:cluster:100_2420_small.jpg?nolink&300|}} 10/19 Startup delayed \\ |
| {{:cluster:100_2424_small.jpg?nolink&300|}} Cold aisle floor tile replacements\\ |
| {{:cluster:100_2430_small.jpg?nolink&300|}} Old CRAC3 removed, 9/13/2019 \\ |
| {{:cluster:100_2433_small.jpg?nolink&300|}} Circulation pumps inside Economizer \\ |
| {{:cluster:100_2449_small.jpg?nolink&300|}} New wall paint job. Thanks! \\ |
| {{:cluster:100_2451_small.jpg?nolink&300|}} Zeocryte cylinder flock \\ |
| {{:cluster:100_2456_small.jpg?nolink&300|}} |
| {{:cluster:100_2454_small.jpg?nolink&425|}} Old and new fans \\ |
| {{:cluster:100_2465_small.jpg?nolink&300|}} Vinyl doors and curtains, CRAC1 startup 10/10/2019 \\ |
| {{:cluster:100_2467_small.jpg?nolink&300|}} Top of racks vinyl curtain \\ |
| {{:cluster:100_2468_small.jpg?nolink&300|}} Ayi. More drilling into hot floor tiles \\ |
| {{:cluster:pp-crac2-vinyl-door.jpg?molink?&300|}} CRAC2 vinyl curtain and door \\ |
| {{:cluster:pp-hot-aisle-curtain-to-crac2.jpg?nolink&300|}} Return hot aisle curtain to CRAC2 \\ |
| |