This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
cluster:92 [2010/12/15 16:49] hmeij |
cluster:92 [2010/12/20 20:36] hmeij |
||
---|---|---|---|
Line 13: | Line 13: | ||
* buy new intel compilers and cmkl? | * buy new intel compilers and cmkl? | ||
- | |||
- | * set a users meeting | ||
- | |||
- | * set up rsnapshot | ||
* run some test jobs via scheduler, some benchmarks | * run some test jobs via scheduler, some benchmarks | ||
Line 22: | Line 18: | ||
* install Lava (no SGE installed, so lets do this first) | * install Lava (no SGE installed, so lets do this first) | ||
- | * copy /share/apps across | + | * rsync over rest of home directories over break (started 20dec10) |
+ | * without the ' | ||
+ | * added ' | ||
+ | |||
+ | * 12/18/2010 set up rsnapshot | ||
+ | * exercising hourly, daily, weekly, monthly | ||
+ | * monitor how long this takes | ||
+ | |||
+ | * 12/ | ||
+ | * will have to rsync petaltail:/ | ||
- | * connect filer3' | + | * 12/ |
- | * anticipated | + | * rsync -vac -k / |
+ | * i will rsync everything over on date X and redo on date X+Y, overwrite | ||
+ | * anticipate | ||
* make sure understand the lack of TSM filesystem backups | * make sure understand the lack of TSM filesystem backups | ||
- | * | ||
* CMU license expired, turns out to be a demo license. | * CMU license expired, turns out to be a demo license. |