This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
cluster:87 [2010/05/13 13:58] hmeij removed |
cluster:87 [2010/05/19 20:55] (current) hmeij |
||
---|---|---|---|
Line 2: | Line 2: | ||
**[[cluster: | **[[cluster: | ||
- | ==== RFQs ==== | ||
- | The Steering Committee has decided to break the purchase of the next cluster up into three pieces. | + | ==== Cluster Software ==== |
- | * Head Node, Disk Array, UPS, and compute nodes to fill Rack #1 ($125, | + | * A good overview, swallowtail is platform OCS/ |
- | * A Database Server (can go to either rack) ($25,000) | + | |
- | * Compute nodes filling Rack # | + | |
- | The dollar amounts are guidelines and not fixed. | + | * [[http://www.hpcprojects.com/ |
- | ==== Details ==== | + | * And I guess this is the spinoff of Kusu/Lava - UniCluster (scheduler? |
- | === Head Node === | + | * [[http:// |
+ | * Then there is HP's version [[http:// | ||
+ | * And the Sun/Oracle [[http:// | ||
+ | |||
+ | * And MOAB ... works with PBS, Torque, LSF, Grid Engine | ||
+ | * | ||
\\ | \\ | ||
**[[cluster: | **[[cluster: | ||
+ | |||
+ | |||
+ |