We are in need to address the problem of tens of thousands of small serial jobs swarming across our larger servers. In doing so these jobs tie up large chunks of memory they do not use and interfere with the scheduling of large parallel jobs (small serial jobs satisfy job prerequisites easily).
So the idea is to assess what we could buy in terms of large core density hardware (max cpu cores per U rack space) with small memory footprints (defined as 1 gb per physical core or less). Nodes can have tiny local disks for OS and local scratch (say 16-120 GB). /home
may not be mounted on these systems so input and output files need to be managed by the jobs and copied back and forth using scp
. The scheduler will be SLURM. The OS CentOS 6.x latest version.
Some testing results can be found here:
The expansion: lines below give an estimation of nr_nodes = int(expansion_budget/node_cost)
ExxactCorp
Node option A: Quantum IXR110-512N E5-2600 v2 family
1U Server, Intel Dual socket R (LGA 2011)
Dual port Gigabit Ethernet
350W High efficiency 1x
Intel® Xeon® processor E5-2620v2, 6C, 2.10
GHz 15M 2x (total 12 cores)
8GB 240-Pin DDR3 1866
MHz ECC/Registered Server Memory 2x (total 16gb ram)
120GB 2.5 SATA III Internal Solid State Drive (SSD)
OS Drive and Scratch Drive 2x
CentOS 6 Installation
3-Year Warranty on Parts and Labor with Perpetual Email and Telephone Support
12 cores/U, 1.3 gb ram/core
expansion: 26 nodes, 26U, 312 cores
Node Option B: Quantum IXR110-512N E5-2600 v3 family
1U Server, Intel Dual socket R (LGA 2011)
Dual port Gigabit Ethernet,
480W High efficiency 1x
Intel® Xeon® processor E5-2650 v3, 10C, 2.3
GHz 25M, 2x (total 20 cores)
16GB DDR4-2133MHz ECC Registered 1.2V Memory Module 2x (total 32gb ram)
120GB 2.5 SATA III Internal Solid State Drive (SSD)
OS Drive and Scratch Drive 2x
CentOS 6 Installation
3-Year Warranty on Parts and Labor with Perpetual Email and Telephone Support
20 cores/U, 1.6 gb ram/core
expansion: 13 nodes, 13U, 260 cores
Advanced Clustering
Node option: Pinnacle 1FX3601
2U Server Enclosure, 4 nodes per enclosure 4x, each node with:
Dual port Gigabit Ethernet
500W High efficiency 1x
Intel® Xeon® processor E5-2630v3, 8C, 2.40
GHz 20M 2x (total 16 cores)
4GB DDR4 2133
MHz ECC/Registered Server Memory 8x (total 32gb ram)
128GB SATA Solid State Drive (SSD) 1x
CentOS 6 Installation
3-Year Warranty on Parts and Labor with Perpetual Email and Telephone Support
64 cores/2U, 2.0 gb ram/core
expansion: 16 nodes, 8U, 256 cores
Microway
Node option: Avoton MicroBlade (up to 28 MicroBlades)
6U Enclosure, :
Two one port Gigabit Ethernet,internal 2×2.5 Ghz ehternet module
1600W High efficiency 200-240V
19 MicroBlades, each with 4 independent nodes and, each
Intel® Atom processor C2750, 8C, 2.40
GHz 1x (total 32 cores/blade) ←– new, see below
8GB DDR3 1600
MHz ECC/Unbuffered 1x (total 32gb ram/blade)
16GB SATA Solid State Drive (SSD) 1x ←– important
CentOS 6, Slurm, OpenMPI, GNU compilers Installation (MCMS - Mircroway provisioning tool)
MicroBlade Chassis Management Module (virtual media - usb/cdrom)
3-Year Warranty on Parts and Labor with Perpetual Email and Telephone Support
608 cores/6U, 1.0 gb ram/core
expansion: 76 nodes, 6U, 608 cores