cluster:178 [2019/09/23 08:54]
hmeij07 [Sept Meetings]
cluster:178 [2019/12/13 08:37]
hmeij07 [The End]
Line 261: Line 261:
 ===== Sept Photos ===== ===== Sept Photos =====
  
 +{{:cluster:100_2396_small.jpg?nolink&300|}} 5-6 feet cold aisle \\
 +{{:cluster:100_2402_small.jpg?nolink&300|}} Tour Guide on back of modular wall \\
 +{{:cluster:100_2407_small.jpg?nolink&300|}} New CRAC1 pressurizing\\
 +{{:cluster:100_2409_small.jpg?nolink&300|}} L-room return damper to hot aisle \\
 +{{:cluster:100_2410_small.jpg?nolink&300|}} 1of2 L-Room cold air supply damper \\
 +{{:cluster:100_2420_small.jpg?nolink&300|}} 10/19 Startup delayed \\
 +{{:cluster:100_2424_small.jpg?nolink&300|}} Cold aisle floor tile replacements\\
 +{{:cluster:100_2430_small.jpg?nolink&300|}} Old CRAC3 removed, 9/13/2019 \\
 +{{:cluster:100_2433_small.jpg?nolink&300|}} Circulation pumps inside Economizer \\
 +{{:cluster:100_2449_small.jpg?nolink&300|}} New wall paint job. Thanks! \\
 +{{:cluster:100_2451_small.jpg?nolink&300|}} Zeocryte cylinder flock \\
 +{{:cluster:100_2456_small.jpg?nolink&300|}} 
 +{{:cluster:100_2454_small.jpg?nolink&425|}} Old and new fans \\
 +{{:cluster:100_2465_small.jpg?nolink&300|}} Vinyl doors and curtains, CRAC1 startup 10/10/2019 \\
 +{{:cluster:100_2467_small.jpg?nolink&300|}} Top of racks vinyl curtain \\
 +{{:cluster:pp-crac2-vinyl-door.jpg?nolink&300|}} CRAC2 vinyl curtain and door \\
 +{{:cluster:pp-hot-aisle-curtain-to-crac2.jpg?nolink&300|}} West hot aisle return to CRAC units \\
 +{{:cluster:100_2473_small.jpg?nolink&300|}} U42 rack is 78 3/4" tall, door is 79" \\
 +
 +
 +===== The End =====
 +
 +Working with PP to see if we can do a floor tile cleaning.
 +
 +Scroll up for the whole story backwards.
 +
 +Commissioning happening 12/20/2019. Still to be fixed is the floor and the Ethernet cables knock outs.\\
 + --- //[[hmeij@wesleyan.edu|Henk]] 2019/12/13 08:36//
  