Warning: Undefined array key "DOKU_PREFS" in /usr/share/dokuwiki/inc/common.php on line 2082
cluster:178 [DokuWiki]

User Tools

Site Tools


cluster:178

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
cluster:178 [2019/10/02 09:25]
hmeij07 [Sept Photos]
cluster:178 [2019/12/13 08:37]
hmeij07 [The End]
Line 262: Line 262:
  
 {{:cluster:100_2396_small.jpg?nolink&300|}} 5-6 feet cold aisle \\ {{:cluster:100_2396_small.jpg?nolink&300|}} 5-6 feet cold aisle \\
-{{:cluster:100_2402_small.jpg?nolink&300|}} Tour Guide \\+{{:cluster:100_2402_small.jpg?nolink&300|}} Tour Guide on back of modular wall \\
 {{:cluster:100_2407_small.jpg?nolink&300|}} New CRAC1 pressurizing\\ {{:cluster:100_2407_small.jpg?nolink&300|}} New CRAC1 pressurizing\\
 {{:cluster:100_2409_small.jpg?nolink&300|}} L-room return damper to hot aisle \\ {{:cluster:100_2409_small.jpg?nolink&300|}} L-room return damper to hot aisle \\
 {{:cluster:100_2410_small.jpg?nolink&300|}} 1of2 L-Room cold air supply damper \\ {{:cluster:100_2410_small.jpg?nolink&300|}} 1of2 L-Room cold air supply damper \\
-{{:cluster:100_2414_small.jpg?nolink&300|}}  
-{{:cluster:100_2416_small.jpg?nolink&300|}} Aiy. Drilling asbestos hot tiles \\ 
 {{:cluster:100_2420_small.jpg?nolink&300|}} 10/19 Startup delayed \\ {{:cluster:100_2420_small.jpg?nolink&300|}} 10/19 Startup delayed \\
 {{:cluster:100_2424_small.jpg?nolink&300|}} Cold aisle floor tile replacements\\ {{:cluster:100_2424_small.jpg?nolink&300|}} Cold aisle floor tile replacements\\
Line 278: Line 276:
 {{:cluster:100_2465_small.jpg?nolink&300|}} Vinyl doors and curtains, CRAC1 startup 10/10/2019 \\ {{:cluster:100_2465_small.jpg?nolink&300|}} Vinyl doors and curtains, CRAC1 startup 10/10/2019 \\
 {{:cluster:100_2467_small.jpg?nolink&300|}} Top of racks vinyl curtain \\ {{:cluster:100_2467_small.jpg?nolink&300|}} Top of racks vinyl curtain \\
-{{:cluster:100_2468_small.jpg?nolink&300|}} AyiMore drilling into hot floor tiles \\+{{:cluster:pp-crac2-vinyl-door.jpg?nolink&300|}} CRAC2 vinyl curtain and door \\ 
 +{{:cluster:pp-hot-aisle-curtain-to-crac2.jpg?nolink&300|}} West hot aisle return to CRAC units \\ 
 +{{:cluster:100_2473_small.jpg?nolink&300|}} U42 rack is 78 3/4" tall, door is 79" \\ 
  
 ===== The End ===== ===== The End =====
Line 285: Line 286:
  
 Scroll up for the whole story backwards. Scroll up for the whole story backwards.
 +
 +Commissioning happening 12/20/2019. Still to be fixed is the floor and the Ethernet cables knock outs.\\
 + --- //[[hmeij@wesleyan.edu|Henk]] 2019/12/13 08:36//
  
 **[[cluster:0|Back]]** **[[cluster:0|Back]]**
cluster/178.txt · Last modified: 2023/09/04 16:46 by hmeij07