     * Amber 16. Nucleosome bench runs 4.5x faster than on a K20     * Amber 16. Nucleosome bench runs 4.5x faster than on a K20
     * Gromacs 5.1.4. Colin's multidir bench runs about 2x faster than on a K20     * Gromacs 5.1.4. Colin's multidir bench runs about 2x faster than on a K20
-    * Lammps 11Aug17. Colloid example runs about 11x faster than a K20+    * Lammps 11Aug17. Colloid example runs about 11x faster than on a K20
     * FSL 5.0.10. BFT bedpostx tests run 16x faster on CPU, a whopping 118x faster on GPU vs CPU.     * FSL 5.0.10. BFT bedpostx tests run 16x faster on CPU, a whopping 118x faster on GPU vs CPU.
     * Price of 128gb node in 2017 was $8,250...price of 256gb node in 2018 is $10,500     * Price of 128gb node in 2017 was $8,250...price of 256gb node in 2018 is $10,500
Line 39: Line 39:
     * Fall back option to v2.2 (definitely free of infringement, minor disruption)     * Fall back option to v2.2 (definitely free of infringement, minor disruption)
     * Move forward option, adopt SLURM (LBL developers, major disruption)     * Move forward option, adopt SLURM (LBL developers, major disruption)
 +
 +  * If we adopt SLURM should we transition to OpenHPC Warewulf/SLURM recipe?
 +    * http://openhpc.community/
 +    * new login node and couple compute nodes to start?
  
   * New HPC Advisory Group Member   * New HPC Advisory Group Member
Line 44: Line 48:
   * Tidbits   * Tidbits
     * Bought deep U42 rack with AC cooling onboard and two PDUs     * Bought deep U42 rack with AC cooling onboard and two PDUs
-    * Pushed Angstrom rack (bss24) out of our area, ready to recycle that+    * Pushed Angstrom rack (bss24) out of our area, ready to recycle that (Done. 06/20/2018)
     * Currently we have two U42 racks empty with power      * Currently we have two U42 racks empty with power 
     * Cooling needs to be provided with any new major purchases (provost, ITS, HPC?)     * Cooling needs to be provided with any new major purchases (provost, ITS, HPC?)
Line 54: Line 58:
     * All Infiniband ports are in use     * All Infiniband ports are in use
  
 +===== Notes =====
 +
 +  * First make a page comparing CPU vs GPU usage which may influence future purchase [[cluster:167|CPU vs GPU]]
 +  * $100k quote, 3to5 vendors, data points mid-2018
 +  * One node (or all) should have configured on it: amber, gromacs, laamps, namd, latest version
 +  * Nvidia latest version, optimal configs cpu:gpu ratios
 +    * Amber 1:1 (may be 1:2 in future releases) - amber certified GPU!
 +    * Gromacs 10:1 (could ramp up to claiming all resources per node)
 +    * Namd 13:1 (could ramp up to claiming all resources per node)
 +    * Lammps 2-4:1
 +  * 128g with enough CPU slots to take over ''hp12'': double ten core minimum
 +  * Anticipated target (also to manage heat exchange)
 +    * 2x10 Xeon CPU (~100gb left) with 2xgtx1080ti GPU (25gb memory required)
 +    * as many as fit budget but but no more than 15 rack wise
  
 \\ \\